— Lüdenscheid facility

At its site in Lüdenscheid, in the presence of Nico Rosberg, ABB shows how the sustainable energy transition can succeed with digital energy management. With its “Mission to Zero”, the leader in digital technology drives the transition from fossil fuels.

630 tons/year CO 2 saved

After a two-year design and construction phase, as part of its “Mission to Zero”, ABB is presenting its first CO 2 -neutral production site in Germany today. As a visible sign of intent, the company is commissioning a solar power plant at its subsidiary Busch-Jaeger in Luedenscheid. The installed ABB technology will generate enough power to cover on sunny days 100 percent of the factories` power requirements.

1100 Mwh/yr Power Generation

200-275 KW Battery Storage Capacity

200 Kwh Co-generation of Heat & Power

Up to 50 KW EV Charging Infrastructure

1250 KW PV System